High Transit provided transport of this fabricated steel box girder to the new bridge construction site between Exits 6 & 7 on the New Jersey Turnpike.

Ohio Innerbelt

Ohio Innerbelt

High Transit transported approximately 450 truck loads of bridge material for the Ohio Innerbelt. The loads ranged from 150 ft. to     155 ft. in length and from 40 tons to 143 tons.